Skip to main content

Posts

Showing posts from 2013

Getting ready to epoxy sheerclamps.

So the sheer clamps are milled and I have tried a dry fit. Now to epoxy them in place. This part has been pretty interesting!
Milling the sheer clamps.
Some time to finally get at it again! I now realize how busy I have been getting the 28 ft Cal "My Dream" ready for the water and fixing up my house for selling (looks like it is sold this AM). Now to find a new place to live. Filling the wire hole from the stiched on side panels and glassing the seems inside. Still a long way to go.
Finally warm enough to do some epoxy fillet work in the cockpit seatback supports. Only spent 2 part days so far. The new 28 ft Cal Jensen 'My Dream' has taken precedence :) 3 weeks before it goes in the water so I have been cleaning up inside it, removing and redoing plywood galley floor, galley cabinets, and varnishing walls. Have to install new galley lights, water pump and faucet, back-kick board with cig elec outlet, and also scrape, sand, and paint the head and V berth. It's going to be a few days. I will be working on the seatback frames of Pocketship for part days as the spring moves along as well. I like to be busy. :) New panel for cabinet door. 'My Dream' about to be uncovered.