Skip to main content

Posts

Showing posts from June, 2013

Getting ready to epoxy sheerclamps.

So the sheer clamps are milled and I have tried a dry fit. Now to epoxy them in place. This part has been pretty interesting!
Milling the sheer clamps.
Some time to finally get at it again! I now realize how busy I have been getting the 28 ft Cal "My Dream" ready for the water and fixing up my house for selling (looks like it is sold this AM). Now to find a new place to live. Filling the wire hole from the stiched on side panels and glassing the seems inside. Still a long way to go.