Skip to main content

Posts

Showing posts from March, 2020
Planing the lumber for the mast.
Been sanding my arms off. :). Just whetted out some areas that had fibreglass weave showing through.  Makes me think it looks almost good enough to varnish this boat instead of painting. :)
About 20 hours his week on cockpit sanding and about half done.
Gave the gaff a coat of epoxy. Used the leftover to fill the little bubble holes in the sanded cockpit.
Made the gaff out of hemlock on Friday.
Sanding the cockpit takes many hours.
March break 2020. Starting on the Gaff. Need 122" x 3" x 1" true. Called Ridge Cedar. Sanding the cockpit while I wait.