Skip to main content
March break 2020. Starting on the Gaff. Need 122" x 3" x 1" true.
Called Ridge Cedar.
Sanding the cockpit while I wait.


Comments

Popular posts from this blog

Portholes finished!!

 

Pocketship finished except sailing hardware.

 Have her finished except for the installation of the sailing hardware package.  Had to fix the bunks on the trailer to fit her perfectly.  She tows very well. 
Had to add this link to YouTube videos of pocketship perfecto for future reference. https://m.youtube.com/watch?v=giYUtFamjcU https://m.youtube.com/watch?v=giYUtFamjcU