This fiberglassing is very time consuming. I have 10 out of the main 14 inside panels done now. This has been about 10 hrs of work. Here are some pics of my latest trip to Mystic CT.
Have her finished except for the installation of the sailing hardware package. Had to fix the bunks on the trailer to fit her perfectly. She tows very well.
Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far. Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.
Comments
Post a Comment