Skip to main content

About 6 hours of sanding the footwell and chain locker.





 I have spent About 6 hours of sanding the footwell and chain locker since the last post. Then I epoxied and varnished the tabernacle. Also put a coat of pettite undercoater on footwell, outside of the cockpit bulkhead and chain locker. 

Also put another coat of spar varnish on the rubrails. 

The major jobs left are the boom gallows, mast and boom.  She also has to be flipped over, fiberglassed and painted underneath.  

Comments

Popular posts from this blog

Last week, Feb 2 and 3rd, I removed the screws and trimmed the starboard side toe rail. I also glued down the port side toe rail.

Bowsprit install.

Bowsprit install.

Waterline struck and first coat.

 Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far.  Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.