Skip to main content

Boom work



 Milled up the 2 hemlock rough 2 x 4 that I bought from Ridge Cedar for the boom. Had to plane it and then rip on table saw to two pieces of 1 7/8 x 2 1/2.  Glued it up with thickened epoxy. Also made a box for the new Furuno radar display for My Dream, the Cal 27.  

Comments

Popular posts from this blog

Last week, Feb 2 and 3rd, I removed the screws and trimmed the starboard side toe rail. I also glued down the port side toe rail.

Bowsprit install.

Bowsprit install.

Waterline struck and first coat.

 Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far.  Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.