Skip to main content

Bottom work.





 Started the bottom work. Filleted the sides of the keel with thickened epoxy. Planed off the undersides of the rubrails. Will have to fill the gaps under them with thickened epoxy, sand and varnish or paint. 

Also put another coat of varnish on the new hatch cover for Cal and also the icebox top.  

Comments

Popular posts from this blog

Last week, Feb 2 and 3rd, I removed the screws and trimmed the starboard side toe rail. I also glued down the port side toe rail.

Bowsprit install.

Bowsprit install.

Waterline struck and first coat.

 Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far.  Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.