Skip to main content

Mast and Tiller.




 Have the mast rounded over with router and sanded ready for one coat of epoxy and probably at least 5 coats of varnish. Same for tiller. 

Only the boom left!!

Except of course the flip over, fibreglass, sanding and painting of the bottom. 

Comments

Popular posts from this blog

Bowsprit install.

Bowsprit install.
Had to add this link to YouTube videos of pocketship perfecto for future reference. https://m.youtube.com/watch?v=giYUtFamjcU https://m.youtube.com/watch?v=giYUtFamjcU

Waterline struck and first coat.

 Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far.  Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.