Skip to main content

Mast work




 The side staves for the mast have been milled and a dry fit made.  I need to get more clamps from Frank Camm and then glue it up tomorrow. 

Comments

Popular posts from this blog

Last week, Feb 2 and 3rd, I removed the screws and trimmed the starboard side toe rail. I also glued down the port side toe rail.

Bowsprit install.

Bowsprit install.

Waterline struck and first coat.

 Figured out how to strike the waterline with the laser level. I just didn’t have the laser level back far enough Then got the first coat done and it looks good so far.  Pettit EZPoxy Electric Sapphire blue with additive. Using roll and tip.